Follow the construction below


Page 1    Page 2    Page 3    Page 4    Page 5    Page 6    Page 7

History          Return to First Page


Progress prior to Christmas 2016
Progress prior to Christmas 2016.


Alan(left) & Dave(right).
Alan(left) & Dave(right)


Cowlings.
Dave has the Ziroli Cowlings fitted.


Dummy Engine.
Dummy engines direct from Ziroli and ready for finishing.


Preppin for glass cloth.
Preparing the upper side of the wing for fibreglass cloth.


Wing to fibreglassed..
Top of the wing fibreglassed anf ready for sanding. I'm glad Dave is doing it :-)


Finished Dummy Engines.
Dummy engines finished and ready for installation.



The construction continues . . .


Page 1    Page 2    Page 3    Page 4    Page 5    Page 6    Page 7

History          Return to First Page